Used oil regeneration plant
Saint-Hyacinthe - Quality Control and pre-operational verifications
Construction of a new plant with a capacity of 60,000 metric tons per year
Volo’s mandate consisted in performing the quality control on civil, mechanical, electrical and instrumentation installations.
Volo was also responsible for preoperational verifications and pre-startup.
This was Volo's first pre-commissioning mandate. The mandate was a success thanks to the experienced team we had put together.